The situation appears quite complicated, especially given the area’s history of flooding.
St. Lucie County is at a critical juncture with a proposed new shopping center that has raised concerns among local residents, particularly regarding flood management. Complaints have primarily come from those already facing drainage issues in their neighborhoods.
Deb Pizzimenti, a resident of Grey Twig Lane, has lived in the area for 13 years and has witnessed severe flooding affecting her property. According to her, stormwater has risen halfway up her shed during heavy rains. Leslie Spratt, another resident, also expressed concerns about the current drainage deficiencies and fears the new shopping center construction will worsen the situation.
The proposed new development would include five buildings, a Bravo supermarket, a Mexican restaurant, and retail space, located on a 5-acre property at Midway Road and 25th Street. Neighbors fear this development will push more water toward their properties and cause structural damage to their homes.
Kori Benton, the county’s planning manager, indicated that the development will need to implement measures to capture and manage stormwater on-site. The county is collaborating with the developer, EDC Incorporated, to find suitable solutions. Benton also noted that if the project moves forward, a more robust stormwater management plan will be required.
The proposal will be reviewed again by the commissioners on October 1, and residents are seeking alternatives that could mitigate existing flooding problems and prevent them from worsening with the new development. The community is awaiting practical solutions that address both their immediate concerns and long-term challenges.

Summary of the issue:
Residents of St. Lucie County are concerned about a development project that could exacerbate existing flooding problems in the area. Specifically, they fear that constructing a new shopping center will impede the natural flow of water and lead to more severe flooding on their properties.
Key concerns of residents:
- Deterioration of existing drainage: Residents point out that the current drainage system is already inadequate, and the new development could make it worse.
- Increased flood risk: They fear the new shopping center will obstruct water flow and cause more frequent and severe flooding in their homes.
- Structural damage: They are concerned about potential structural damage that flooding could cause to their houses.
Actions taken so far:
- Communication with authorities: Residents have voiced their concerns to St. Lucie County officials.
- Project evaluation: The county is working with the developer to assess the project’s impact on drainage and flooding.
- Proposal review: The proposal will be presented again to the commissioners on October 1.
Possible solutions and recommendations:
- Comprehensive environmental impact assessment:
- Conduct a detailed environmental impact study that includes hydrological and geotechnical analysis of the site.
- Evaluate the existing drainage system’s capacity to handle increased water flow.
- Identify the most flood-vulnerable areas and propose specific mitigation measures.
- Design of an effective stormwater management system:
- Implement a stormwater management system that includes:
- Retention: Establish water retention areas on the development site to reduce the flow of water reaching the existing drainage system.
- Infiltration: Promote water infiltration into the soil through the creation of rain gardens, infiltration trenches, and other techniques.
- Channels and drains: Build additional channels and drains to improve water flow and prevent pooling.
- Implement a stormwater management system that includes:
- Community involvement:
- Organize community meetings to inform residents about the development plans and listen to their concerns.
- Create a neighborhood committee to work together with authorities and the developer in finding solutions.
- Review of building codes:
- Assess whether existing building codes are adequate to address flooding challenges in the area.
- Update codes if necessary to ensure new developments are designed to withstand flooding.
- Funding:
- Identify funding sources to implement flood mitigation measures, such as government grants or public-private partnerships.
Additional considerations:
- Climate change: It is important to consider the effects of climate change on increased rainfall and sea levels when designing solutions.
- Long-term development: Solutions should be sustainable in the long term and consider the community’s future growth.
Conclusion:
The flooding issue in St. Lucie County requires a comprehensive solution involving all stakeholders. By implementing the proposed measures and working together, it is possible to minimize flood risks and protect residents’ properties.
Image: Wflx






